Skip to main content

Approval documents

Consolidated Consent

Bulli Seam Operations Consolidated-Consent April 2022.pdf

MODIFICATION 1

Bulli Seam Operations Project Modification 1 – April 2015.pdf

MOD 1 offset conditions EA.pdf

South32 Illawarra Coal Strategic Biodiversity Offset Statement.pdf

MODIFICATION 2

Bulli Seam Operations Project Modification 2 – October 2016.pdf

Bulli Seam Operations MOD 2 EA - Part A.pdf

Bulli Seam Operations MOD 2 EA - Part B.pdf

Bulli Seam Operations MOD 2 EA - Part C.pdf

MODIFICATION 3

Modification_Report - MOD3.pdf

Bulli Seam Operations Project Modification 3 - April 2022.pdf

Appendix A - Agricultural Impact Statement.pdf

Appendix B - Noise and Vibration Assessment.pdf

Appendix C - Air Quality and GHG Assessment.pdf

Appendix D - Traffic Assessment Report.pdf

Appendix E - BDAR.pdf

Appendix F - ACHA.pdf

Appendix G_Historical Heritage Assessment.pdf

PREFERRED PROJECT REPORT

Preferred Project Report.pdf

Preferred Project Report Supplementary Information.pdf

ENVIRONMENTAL ASSESSMENT
  • Bulli Seam Operations – EPBC Approval 2010 - 5350
    457.00 KB
  • Bulli Seam Operations – EPBC Approval 2010 - 5722
    157.00 KB
  • Appin Surface Gas Management Project Environmental Assessment
  • Appin Mine Surface Gas Management Project Approval (Mod 1)
    399.00 KB
  • Appin Surface Gas Management Project Environmental Assessment Mod 2
  • Appin Mine Surface Gas Drainage Project Consolidated Project Approval (Mod-2)
  • ApAppin Surface Gas Management Project Environmental Assessment Mod 1
  • Appin Surface Gas Management Rehabilitation Management Plan
    737.00 KB
  • Appin Mine Safety Gas Drainage Project Environmental Management Plan
  • Appin Mine Surface Gas Management Project Approval
  • Annex A - Appin Surface Gas Management Project Director General's Requirements
  • Annex B - Appin Surface Gas Management Project Drainage Plans
  • Annex C - Appin Surface Gas Management Project GHG Assessment
  • Annex D - Appin Area 7 Flora and Fauna Assessment
  • Annex E - Appin Surface Gas Management Project Cultural Heritage Assessment
  • Annex F - Appin Surface Gas Management Project Aboriginal Cultural Heritage Management Plan
  • Annex G - Appin Surface Gas Management Project Noise Assessment
  • Annex H - Appin Surface Gas Management Project Air Assessment
  • Annex I - Appin Surface Gas Management Project Agency Correspondence
Subsidence Management Plans / Extraction Plans
  • Extraction Plan Approval Condition 2 – Landslide Risk Assessment
  • Appendix B - Subsidence Monitoring Program
  • Appendix C - Water Management Plan - Part 1
  • Appendix C - Water Management Plan - Part 2
  • Appendix D - Biodiversity Management Plan
  • Appendix F - Heritage Management Plan
  • Appendix G - Public Safety Management Plan
  • Appendix H - Built Features Management Plan
  • Appendix I - Coal Resource Recovery Plan
    945.00 KB
  • Extraction Plan Approval Condition 4 – Groundwater Impact Assessment Addendum
  • Extraction Plan Approval Condition 4 – Groundwater Impact Assessment Peer Review
    431.00 KB
  • Longwalls 709 to 711 and 905 Approval of Conditions
    643.00 KB
  • Longwalls 709 to 711 and 905 Extraction Plan Approval Letter
    285.00 KB
  • Longwalls 709 to 711 And 905 Extraction Plan Main Document
  • Longwalls 709 to 711 and 905 Extraction Plan Variation 1 Approval
    635.00 KB
  • Appendix D - Longwalls 705-710 Impacts of Subsidence on Terrestrial Flora and Fauna
  • Appendix B - Longwalls 705-710 Assessment of Surface Water Flow and Quality Effects
  • Appendix C - Longwalls 705-710 Effects of Mine Subsidence on Aquatic Habitat and Biota
  • Appendix E - Archeological and Cultural Heritage Impact Assessment of Proposed Longwalls 705-710
  • Appendix E - Archeological and Cultural Heritage Impact Assessment of Proposed Longwalls 705-710
  • Appendix G - Longwalls 705-710 Risk Assessment
    567.00 KB
  • Appendix G - Longwalls 705-710 Risk Assessment
    567.00 KB
  • Appendix H - Longwalls 705-710 Groundwater Assessment
  • Appin Area 7 – Withdrawal of SMP Approval
    191.00 KB
  • Appin Area 7 Longwalls 705-706 Environmental Management Plan
  • Appin Area 7 Longwalls 705-710 Public Safety Management Plan
    452.00 KB
  • Appin Area 7 Longwalls 707-710 Environmental Management Plan
  • Appin Longwalls 705-706 SMP Approval Conditions
    463.00 KB
  • Appin Longwalls 705-706 SMP Approved Plan
  • Appin Longwalls 707 - 710 SMP Approval
    193.00 KB
  • Appin Longwalls 707 - 710 SMP Approval Conditions
    479.00 KB
  • Appin Longwalls 707 - 710 SMP Variation Approval
    224.00 KB
  • Chapter 1 - Introduction
    407.00 KB
  • Chapter 10 - Subsidence Predictions and Impacts on Ecology
    119.00 KB
  • Chapter 11 - Subsidence Predictions and Impacts on Man Made Features
    408.00 KB
  • Chapter 12 - Statutory Requirements
  • Chapter 15 - Summary and Assessment of Environmental Factors
    159.00 KB
  • Chapter 2 - Application Area
    143.00 KB
  • Chapter 3 - Mining System and Resource Recovery
  • Chapter 6 - Characterisation of Surface and Sub-Surface Features
  • Chapter 7 - Subsidence Predictions and Impacts
    530.00 KB
  • Chapter 8 - Subsidence Predictions and Impacts on Natural Features
    163.00 KB
  • Chapter 9 - Subsidence Predictions and Impacts on Hydrology
  • Chapters 13 and 14 - Risk Assessment and Community and Stakeholder Consultation
  • Chapters 4 and 5 - Site Conditions and Stability of Underground Workings
  • Longwalls 705-710 Proposed Subsidence Management Plan

Monitoring documents

View 14 Day Monitoring Report
  • Bulli Seam Operations Historical Monitoring Data
    6.00 MB

Management plans

  • Appin Mine Adaptive Management Plan for Water Sensitive EPBC Species
  • Appin Mine Biodiversity Management Plan
  • Appin Mine Persoonia Hirsuta Offset Management Plan
  • Appin Mine Snake and Bandicoot Management Plan
  • Ventilation Shaft 6 Biodiversity Offset Strategy
  • Appin Mine Shale Sandstone Transition Forest Offset Management Plan

Reports

Project Approval

  • Bulli Seam Operations Daily Coal Transport Tonnages FY23
    199.00 KB

EPBC Approval

  • Annual Persoonia Hirsuta Condition Monitoring Report - 2019
    805.00 KB
  • Annual Vent Shaft No.6 Annual Offset Monitoring Report - 2019

Environment Protection Licence

  • EPL2504 - Georges River Environmental Improvement Program (EIP2) Report - Year 5 (2019)
  • EPL2504 - Georges River Environmental Improvement Program (EIP2) Report - Year 3 (2017)
  • EPL2504 - Georges River Environmental Improvement Program (PRP20) Report - Year 2 (2015)
  • EPL2504 - Pollution Reduction Program 20, Monitoring Report Year 1 (2014)
  • Georges River Aquatic Health Monitoring Report (2023)
  • Georges River Aquatic Health Monitoring Report (2022)
  • Pollution Reduction Program West Cliff Mine Water Discharge Ecotoxicity Study

Dam Safety Act

Mining Leases

End of Panel Reports

  • Attachment E2 - Longwall 38 Terrestrial Ecology Assessment
    268.00 KB
  • Attachment A - Area 5 SMP and Extraction Plan Approval
    612.00 KB
  • Attachment A - Longwalls 37-38 Extraction Plan & SMP Approvals
    972.00 KB
  • Attachment B - Longwall 37 End of Panel Subsidence Monitoring Report
  • Attachment B - Longwall 38 End of Panel Subsidence Monitoring Report
  • Attachment C - Longwall 37 End of Panel Landscape Report
  • Attachment C1 - Impact and Impact Update Reports
  • Attachment C1 - Longwall 38 End of Panel Landscape Report
  • Attachment C2 - Longwall 38 Impacts Reports
  • Attachment D - Longwall 37 End of Panel Surface and Shallow Groundwater Assessment
  • Attachment D - Longwall 38 Surface and Groundwater Monitoring Report
  • Attachment E - West Cliff Area 5 Aquatic Ecology Assessment
  • Attachment E1 - Area 5 Aquatic Ecology Monitoring 2003-2016
  • Attachment F - Longwall 37 End of Panel Cultural Heritage Assessment
  • Attachment F - Longwall 38 End of Panel Aboriginal Heritage Assessment
  • Longwall 38 End of Panel Report
  • West Cliff Area 5 Longwall 37 End of Panel Report
  • Attachment C2 - Longwall 705 Impact Reports
  • Appin Longwall 705 End of Panel Report
  • Attachment A - Appin Longwalls 705-706 SMP Approval Conditions
    742.00 KB
  • Attachment A - Appin Longwalls 705-706-SMP Approval Conditions
    466.00 KB
  • Attachment B - Longwall 705 End of Panel Subsidence Report
  • Attachment C - Longwall 705 End of Panel Landscape Monitoring Report
  • Attachment D - Longwall 705 End of Panel Surface and Shallow Groundwater Report
  • Attachment E - Longwall 705 Aquatic Ecology Report
  • Attachment F - Longwall 705 End of Panel Terrestrial Ecology Report
    352.00 KB
  • Attachment G - Longwall 705 End of Panel Cultural Heritage Report
  • Attachment H - Longwall 705 End of Panel Groundwater Report
  • Attachment F - Longwall 706 End of Panel Cultural Heritage Report
  • Appin Longwall 706 End of Panel Report
  • Attachment B - Longwall 706 End of Panel Subsidence Report
  • Attachment C1 - Longwall 706 End of Panel Landscape Monitoring Report
  • Attachment C2 - Longwall 706 Impact Reports
  • Attachment D - Longwall 706 End of Panel Surface and Groundwater Report
  • Attachment E - Longwall 706 Aquatic Ecology Report
  • Attachment C - 7 Longwall 707 Landscape Report
  • Appin Longwall 707 End of Panel Report
  • Attachment A - Appin Longwalls 707 - 710 Approval Conditions
    479.00 KB
  • Attachment B - 7 Longwall 707 Subsidence Monitoring Report
  • Attachment D - Longwall 707 Impact and Private Property Reports
  • Attachment E - Longwall 707 Surface Water & Groundwater Assessment
  • Attachment F - Appin Longwall 707 Aquatic Ecology Assessment
    307.00 KB
  • Attachment E - Longwall 709 Post-mining Property Reports
  • Attachment A - Longwalls 709 to 711 and 905 EP Approval
    285.00 KB
  • Attachment B - Longwall 709 Landscape Report
  • Attachment C - Longwall 709 Subsidence Assessment
  • Attachment D - Longwall 709 Groundwater and Surface Water Assessment
  • Attachment F - Longwall 709 Aquatic Flora and Fauna Assessment
    617.00 KB
  • Longwall 709 End of Panel Report
  • Attachment C3 - Appin Longwall 903 Property Reports
  • Appin Longwall 903 End of Panel Report
  • Attachment A1 - Appin Area 9 EP - Approval - signed
    115.00 KB
  • Attachment B - End of Panel Subsidence Monitoring Review Report for Appin Longwall 903
  • Attachment C1 - Appin Longwall 903 Landscape Report
  • Attachment C2 - Appin Longwall 903 Impact Reports
  • Attachment D - Area 9 Longwall 903 End of Panel Surface Water and Groundwater Monitoring Review
  • Attachment E - Appin Areas 9 Longwall 903 End of Panel Report - Aquatic Flora and Fauna Review
  • Attachment B - Appin LW905 Subsidence Monitoring Review
  • 1. Appin Longwall 905 End of Panel Summary Report
  • Attachment A - Longwalls 709 to 711 and 905 EP Approval
    285.00 KB
  • Attachment C1 - Appin LW905 EoP Landscape Report
  • Attachment C2 - Appin LW905 Private Property Reports
  • Attachment D - Appin LW905 EoP SW and GW
  • Attachment E - Appin LW905 EoP Aquatic Flora and Fauna Review
    614.00 KB
  • Attachment F - Appin LW905 Geotechnical Observations
    248.00 KB

Audits

  • 2022 - Bulli Seam Operations - Independent Environmental Audit
  • 2022 - Bulli Seam Operations - Independent Environmental Audit - Action Response Table
    469.00 KB
  • 2019 - BSO Independent Environmental Audit
  • 2019 - Bulli Seam Operations - Independent Environmental Audit - Action Response Table
    315.00 KB
  • 2017 - Bulli Seam Operations Project Independent Environment Audit
  • 2017 - Illawarra Metallurgical Coal's Response to Recommendations
    102.00 KB
  • 2013 - Bulli Seam Operations Project Independent Environment Audit
  • 2013 - Illawarra Metallurgical Coal's Response to Recommendations

Community documents

  • Bulli Seam Community Complaints Report - April 2024
    591.00 KB
  • Appin Community Consultative Committee Meeting - December 2023 FINAL
    332.00 KB
  • Appin Community Consultative Committee Meeting - October 2023 FINAL
    313.00 KB
  • Appin Mine Community Consultative Committee Meeting August 2023 - FINAL
    277.00 KB
  • Appin Mine Community Consultative Committee Meeting June 2023 - DRAFT
    362.00 KB
  • Appin Mine Community Consultative Committee Meeting April 2023 – FINAL
    338.00 KB
  • Appin Mine Community Consultative Committee Meeting February 2023 – FINAL
    367.00 KB
  • Appin Mine Community Consultative Committee Meeting September 2022 - FINAL
    167.00 KB
  • Appin Mine Community Consultative Committee Meeting July 2022 - DRAFT
    250.00 KB
  • Appin Mine Community Consultative Committee Meeting May 2022 - FINAL
    277.00 KB
  • Appin Mine Community Consultative Committee Meeting March 2022 - FINAL
    320.00 KB
  • Appin Mine Community Consultative Committee Meeting January 2022 - FINAL
  • Appin Mine Community Consultative Committee Meeting November 2021 - FINAL
    535.00 KB
  • Appin Mine Community Consultative Committee Meeting September 2021 - FINAL
    230.00 KB
  • Appin Mine Community Consultative Committee Meeting July 2021 - FINAL
    185.00 KB
  • Appin Mine Community Consultative Committee Meeting May 2021 - FINAL
    156.00 KB
  • Appin Mine Community Consultative Committee Meeting February 2021 - FINAL
    411.00 KB
  • Appin Mine Community Consultative Committee Terms of Reference - 2021
    231.00 KB
  • Appin Community Consultative Committee Meeting - April 2024 FINAL DRAFT
    344.00 KB
  • Appin Community Consultative Committee Meeting - February 2024 DRAFT
    327.00 KB
  • Appin Mine Community Consultative Committee Meeting October 2023 - DRAFT
    313.00 KB
  • Illawarra Metallurgical Coal Community Partnership Program - Grant Guidelines , Application Form and Compliance Certificate
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes November 2023
    158.00 KB
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes - August 2023
    152.00 KB
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes - February 2021
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes - July 2021
    134.00 KB
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes - July 2022
    250.00 KB
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes - March 2021
    166.00 KB
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes - May 2021
    179.00 KB
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes - May 2023
    145.00 KB
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes - November 2022
    148.00 KB
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes - September 2021
    130.00 KB
  • Illawarra Metallurgical Coal Community Partnership Program Meeting Minutes February 2024 - DRAFT
    154.00 KB